中文
  Contact us Opportunities
   Home
   Modelling Technology
   Modelling Software
   LID Software
- XPdrainage
- Stormwater Harvesting
- LID Guideline
- Research & Cases
   Water Quality Instruments
   Ewaters Resources
   Press
   About us
   Opportunities
   Contact us
Your present position: Home >> LID Software >> Research & Cases Back to Previous Page

 The ecological drainage construction planning of Guantan new town of Zhenjiang City

Shen Yang1, Jiang Zhao2

(1 Ewaters Environmental Science&Technology(Shanghai)Ltd.Shanghai,200040,)

(2 Planning and Design Institute of Zhengjiang city, 212004)

 

Abstract: The ecological drainage construction plan idea was proposed to coordinate the Guantang new town planning with low carbon, ecology, wisdom and livable environment concepts. This plan adopted foreign mature experience of low impact development and flood risk assessment techniques. The Guantang new town drainage works were arranged with considering rainwater utilization, pollutant source controlurban green corridorextraordinary flood discharge channels and optimization of urban land useThe ecological drainage construction plan and the guidelines for the design, construction, maintenanceand management were compiled to provide technical and operational management basis for implementation of the ecological concept in the construction process

 


  News more  
    Modeling Extreme Events-...  
    Advanced monitoring tech...  
    Lisbon trial shows benef...  
    Successful final effluen...  
    New 'floating monitor' u...  
    Intellitect Water contin...  
    Successful Final Effluen...  
 
Copyright: Ewaters Environmental Science and Technology (Shanghai) Co. Ltd.
9F, Eco-city, 1788 West Nanjing Road,Shanghai 200040, China   Ph:0086- 21 2231 0560
沪ICP备07036127号